PH needs 53GW by 2040 under higher RE portfolio standard
ILOILO CITY: The country would need 52.83 gigawatts of renewable energy (RE) capacity by 2040 after the Department of Energy (DOE) hiked the renewable portfolio standard (RPS) to 2.52 percent, an energy official said.
During the Philippine Electric P…